East Side Coastal Resilience Project Area 1
Project Highlights
PROJECT VALUE
$1.2 Billion
PROJECT SERVICES
Quality Assurance
Civil Engineering
Construction Inspection
CADD
For this project, the construction inspection team provided oversight for the installation of lighting systems and related infrastructure throughout several recreational areas. This work encompassed managing the electrical installations such as the placement of underground conduits, pull boxes, and light poles, as well as the installation of underground cables to establish permanent electrical service. The inspection team ensured that all electrical work complied with design specifications, industry standards, and local codes, resulting in a reliable and safe power supply for new site amenities. In coordination with broader flood resilience measures, the inspection team monitored the integration of lighting installations with floodwalls, floodgates, and upgraded drainage systems.
They oversaw the careful placement of copper pipes feeding fountains, hydrants, and RPZ systems, ensuring that the electrical and plumbing elements did not conflict. Additionally, the team verified the proper installation of manholes and catch basins to maintain effective drainage, taking steps to confirm that lighting components did not impede critical infrastructure.
Key Project Services
Electrical & Lighting Infrastructure –
Flood Resilience System Integration –
Utility Coordination & Inspection